With the implementation of Solar Package I and the publication of the two ordinances amending the NELEV (Electrotechnical Properties Verification Ordinance) and EAAV (Energy System Requirements Ordinance), the German government has simplified the verification of the electrotechnical properties of generation systems with an installed capacity of up to 500 kW and a feed-in capacity of up to 270 kW.
In concrete terms, this means that the affected systems can no longer be subject to the traditional system certification process. A system certificate and a declaration of conformity are no longer required in the simplified procedure.
It is also possible to switch to the simplified procedure if the certification process has already begun.
The following conditions must be met for the simplified verification procedure to be used:
- The sum of the maximum active power of all generation units (PV inverters, CHP units, etc.) connected to the grid connection point is a maximum of 500 kW. Both newly planned generation units and existing units are taken into account.
- The maximum feed-in capacity into the grid operator's grid is a maximum of 270 kW.
- Deadlines from any system certification process that has already begun have not yet been exceeded (e.g. for submitting the declaration of conformity after the generation system has already been commissioned).
Systems with the simplified verification procedure may go into operation in accordance with VDE-AR-N 4105; the requirements of the EAAV must also be taken into account. This significantly simplifies the verification procedure.
The specific implementation, including decision support, is summarized in the FNN notice “Simplified connection and verification of generation systems and storage facilities with grid connection in medium and high voltage”, see link to the German version below.
If you are unclear about the application or the change to the simplified verification procedure, please contact the responsible grid operator.
If you have any questions regarding the handling of projects already commissioned with us, please contact our Customer Service.